Port Environment

Sr. No.  Date of issue Subject
Year- 2024    
1 01/01/2024 “Establishment of RoRo/Ropax Facility at Pipavav Gujarat – EC & CRZ Clearance Reg”
2 01/01/2024 “Establishment of RoRo/Ropax Facility at Muldwarka, Gujarat – EC and CRZ Clearance Reg”
3 03/01/2024 Augmentation of Liquid Cargo Handling Capacity from 8 MMTPA to 23.8 MMTPA through modernization of Existing Pipeline network at Oil Jetty Area, Deendayal Port Authority, Kandla
4 04/03/2024 Submission of 6 month Compliance report of stipulated conditions mentioned in the EC & CRZ Clearance granted by the MoEF&CC, GOI and Monitoring data sheet for “Development of 7 integrated facilities (Stage I) within existing Deendayal Authority at Kandla.”
5 14/03/2024 Submission of six-monthly compliance report of conditions stipulated in Consent to Establish (NOC) Order issued by the GPCB, Gujarat for “Development of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust)” reg.
6 14/03/2024 Submission of six-monthly compliance report of conditions stipulated in EC & CRZ Clearance granted by the MoEF&CC, GoI for “Development of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust)” reg.
7 14/03/2024

Submission of six-monthly compliance report of conditions stipulated in CRZ recommendation issued by the GCZMA, Gujarat for “Development of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust)” reg.

8 15/03/2024

Submission of compliance report of stipulated conditions mentioned in the CCA order issued by the GPCB reg.

9 19/03/2024

Bifurcation (600 mt waterfront out of total 4800 mt) of Environmental and CRZ clearance issued to M/s Essar Bulk Terminal Limited for Expansion of Port Facility at Hazira, Surat, Gujarat – Submission of Compliance Report of Stipulated Conditions reg.

10 19/03/2024

Bifurcation (600 mt waterfront out of total 4800 mt) of Environmental and CRZ clearance issued to M/s Essar Bulk Terminal Limited for Expansion of Port Facility at Hazira, Surat, Gujarat – Submission of Compliance Report of Stipulated Conditions in CRZ recommendation reg.

11 19/03/2024

“Construction of 13h to 16th Cargo Berths at Kandla” by M/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) – Compliance Report of conditions stipulated in Environmental & CRZ Clearance and Monitoring Report in Data Sheet reg

12 19/03/2024

“Construction of 13th to 16h Cargo Berths at Kandla” by M/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) – Point wise Compliance to the stipulations in CRZ Recommendations reg.

13 19/03/2024

Proposed Smart Industrial Port City (SIPC) at green Field Site 2 (KPT Complex, 850 Acres), Gandhidham, Kutch – Gujarat by M/s Deendayal Port Authority (Erstwhile: M/s Kandla Port Trust) – Six Monthly compliance Report of conditions stipulated In Environmental Clearance & Monitoring Report In Data Sheet reg.

14 19/03/2024

Proposed Smart Industrial Port City (SIPC) at green Field Site 2 (KPT Complex, 850 Acres), Gandhidham, Kutch – Gujarat by M/s Kandla Port Trust – Six Monthly compliance Report of conditions stipulated in NOC/CTE Order reg.

15 28/03/2024

 CRZ Clearance for “Creation of water front facilities (Oil Jetties 8,9, 10 & 11) and development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M/s Deendayal Port Authority” – Submission of six monthly Compliances of the stipulated conditions in CRZ Recommendations reg.

16 28/03/2024

Creation of water front facilities (Oil Jetties 8, 9, 10 & area 11)a nd development of land of 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M/s Deendayal Port Trust – Environmental & CRZ Clearance Six Monthly Compliance report for the stipulated conditions in EC&CRZ Clearance Submission of and Monitoring Report in Data sheet reg.

17 28/03/2024

“Creation of water front facilities (Oil Jetties 8, 9, 10 & 11) and development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M/s Deendayal Port Authority (Erstwhile: Deendayal Port Trust)- Submission of Point-wise Compliance of Conditions stipulated in the NOC/CTE reg.

18 01/07/2024 Development of Setting up of RoRo/RoPax Facility at Pipavav, Gujarat, Rajula, Amreli by Deendayal Port Authority – Pointwise compliances of the conditions stipulated in the EC&CRZ Clearance and Monitoring Report in Datasheet reg.
19 01/07/2024 Development of Setting up of RoRo/RoPax Facility at Pipavav, Gujarat, Rajula, Amreli by Deendayal Port Authority – Pointwise Compliances of the conditions stipulated in the CRZ recommendation reg.
20 05/07/2024 Development of Setting up of RoRo/RoPax Facility at, Muldwarka, Gujarat, by Deendayal Port Authority at Survey No. 74/3 for Onshore area -6 Ha, Muldwarka, Kodinar, Gir Somnath. (Offshore Facility: 320m waterfront & Onshore Facility: 6Ha. Area Development) – Pointwise compliances of the conditions stipulated in the EC&CRZ Clearance and Monitoring Report in Datasheet reg.
21 05/07/2024 Development of Setting up of RoRo/RoPax Facility at, Muldwarka, Gujarat, by Deendayal Port Authority at Survey No. 74/3 for Onshore area -6 Ha, Muldwarka, Kodinar, Gir Somnath. (Offshore Facility: 320m waterfront & Onshore Facility: 6Ha. Area Development) – Pointwise Compliances of the conditions stipulated in the CRZ recommendation reg.
22 19/07/2024 Submission of Annual Returns Hazardous waste (Form IV) (year 2023-24) and Environmental Statement in Form V (2023-24) for Deendayal Port Authority
23 19/07/2024 Submission of Environmental statement in Form V for the financial year 2023-24 reg.
24 24/07/2024 Construction of 13th to 16th Cargo berths at Kandla by M/s Deendayal Port Authority(Erstwhile Deendayal Port Trust)- Compliance Report of conditions stipulated in Environmental & CRZ Clearance and Monitoring Report in Data Sheet reg.
25 24/07/2024 “Construction of 13th to 15th Cargo Berths at Kandla” by M/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) – Point wise Compliance to the stipulations in CRZ Recommendations reg.
26 25/07/2024 Development of 7 Integrated facilities (Stage 1) within the existing Kandla Port Trust limit at District Kutch (Gujarat) by M/s Kandla Port Trust Limited” – Pointwise Compliances of the conditions stipulated in CRZ Recommendations reg.
27 25/07/2024 Development of 7 Integrated facilities (Stage 1) within the existing Kandla Port Trust limit at District Kutch (Gujarat) by M/s Kandla Port Trust Limited – Pointwise Compliance of the conditions stipulated in NOC (CTE-74334) issued by GPCB reg
28 25/07/2024 Development of 7 Integrated facilities (Stage 1) within the existing Kandla Port Trust limit at District Kutch (Gujarat) by M/s Kandla Port Trust Limited – Environmental & CRZ Clearance – Pointwise Compliances of the conditions stipulated in the EC&CRZ Clearance and Monitoring Report in Datasheet Reg
29 29/07/2024 Augmentation of Liquid Cargo Handling Capacity from 8 MMTPA to 23.8 MMTPA Through Modernization of Existing Pipeline Network at Oil Jetty Area, Deendayal Port Trust, Kandla – Pointwise Compliances of the conditions stipulated in CRZ recommendation
30 30/07/2024 Augmentation of Liquid Cargo Handling Capacity from 8 MMTPA to 23.8 MMTPA Through Modernization of Existing Pipeline Network at Oil Jetty Area, Deendayal Port Trust, Kandla – Pointwise Compliances of the conditions stipulated in NOC (CTE – 115467) issued by the GPCB reg
31 06/08/2024 Augmentation of Liquid Cargo Handling Capacity from 8 MMTPA to 3.8 MMTPA through Modernization of existing pipeline network at Oil Jetty area Deendayal Port trust, Kandla – Pointwise Compliance of the conditions stipulated in the EC & CRZ Clearance and Monitoring Report in Datasheet reg.
32 09/08/2024 Development of Integrated facilities (Stage II) within the existing Deendayal Port Trust (Erstwhile Kandla Port Trust) at District Kutch, Gujarat. ( 1. Setting up of Oil Jetty No.7 2. Setting up of Barge Jetty at Jafarwadi 3. Setting up of Barge port at Veera; 4. Administrative office building at Tuna Tekra; 5. Road connecting from Veera barge jetty to Tuna gate by M/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) Compliances of the stipulated conditions in CRZ Recommendations reg.
33 09/08/2024 Development of Integrated facilities (Stage II) within the existing Deendayal Port Trust (Erstwhile Kandla Port Trust) at District Kutch, Gujarat. ( 1. Setting up of Oil Jetty No.7 2. Setting up of Barge Jetty at Jafarwadi 3. Setting up of Barge port at Veera; 4. Administrative office building at Tuna Tekra; 5. Road connecting from Veera barge jetty to Tuna gate by M/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) – Submission of compliance report of stipulated conditions mentioned in the CTE issued by the GPCB reg.
34 09/08/2024 Development of Integrated facilities (Stage II) within the existing Deendayal Port Trust (Erstwhile Kandla Port Trust) at District Kutch, Gujarat. ( 1. Setting up of Oil Jetty No.7 2. Setting up of Barge Jetty at Jafarwadi 3. Setting up of Barge port at Veera; 4. Administrative office building at Tuna Tekra; 5. Road connecting from Veera barge jetty to Tuna gate by M/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) – Six Monthly compliance Report of conditions stipulated in Environmental & CRZ Clearance & Monitoring Report in Data Sheet Reg.
35 09/08/2024 Environment & CRZ Clearance for the Construction of Interchange cum Road Over Bridge (ROB) at LC-236 [Kutch salt junction] on N.H-141 to Nehru gate of Kandla port, Gandhidham, Kutch proposed by M/s Deendayal Port Trust – Compliance of stipulated conditions mentioned in the Environmental & CRZ Clearance reg.
36 09/08/2024 Environment & CRZ Clearance for the Construction of Interchange cum Road Over Bridge (ROB) at LC-236 [Kutch salt junction] on N.H-141 to Nehru gate of Kandla port, Gandhidham, Kutch proposed by M/s Deendayal Port Trust (Erstwhile : Deendayal Port Trust) – Compliance of stipulated conditions mentioned in the Environmental & CRZ Clearance reg.
37 13/08/2024 Creation of water front facilities (Oil jetties 8,9,10 & 11) and development of land of are 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M/s Deendayal Port Trust – Environmental & CRZ Clearance – Submission of Six Monthly Compliance report for the stipulated conditions in EC&CRZ Clearance and Monitoring Report in Data Sheet reg.
38 13/08/2024 Creation of water front facilities (Oil jetties 8,9,10 & 11) and development of land of are 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M/s Deendayal Port Authority (Erstwhile: Deendayal Port Trust) – Submission of Point-wise Compliance of conditions stipulated in the NOC/CTE reg.
39 13/08/2024 Creation of water front facilities (Oil jetties 8,9,10 & 11) and development of land of are 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M/s Deendayal Port Authority – Submission of Six monthly Compliances of the stipulated conditions in CRZ Recommendations reg.
40 23/08/2024 Consolidated Consent & Authorization (Renewal) order no AWH-110594 date of issue 22/01/2021 (GPCB ID 28494) – submission of compliance report of stipulated conditions mentioned in the CCA Order issued by the GPCB reg.
41 02/09/2024 Single Point Mooring (SPM) and allied facilities off Veera in Gulf of Kutch for handling crude oil on BOT basis in the state of Gujarat by M/s. Kandla Port Trust (Now Deendayal Port Authority) – Six monthly compliance report of conditions stipulated in CRZ Recommendations reg.
42 02/09/2024 Setting up of Single Point Mooring (SPM) and Allied Facilities off-Veera in Gulf of Kutch for handling Crude oil on B0T basis Six Monthly Compliance Report of conditions stipulated in Environmental & CRZ Clearance & Monitoring Report in Data Sheet reg.
43 05/09/2024 Proposed Smart Industrial Port City (SIPC) at green Field Site 1 (Adipur side- Northeast of Antarjaal, South of Tagore Road, 580 Acres), Gandhidham, Kutch – Gujarat by M/s Deendayal Port Authority – Submission of Six- monthly Compliance report for the project reg.
44 19/09/2024 Development of 3 Remaining Integrated Facilities (Stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat -Submission of Point-wise Compliances of the stipulated conditions in CRZ Recommendations
45 19/09/2024 Development of 3 Remaining Integrated Facilities (Stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat – Pointwise compliance of the conditions stipulated in the EC&CRZ clearance and Monitoring report in Datasheet Reg.
46 19/09/2024 Development of 3 Remaining Integrated Facilities (Stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat – Submission of compliance report of stipulated conditions mentioned in the CTE issued by the GPCB reg.
47 22/10/2024 Proposed Smart Industrial Port City (SIPC) at green field Site 2 (KPT Complex, 850 Acres), Gandhidham, Kutch – Gujarat by M/s Deendayal Port Authority ( Erstwhile: M/s Kandla Port Trust) – Six Monthly compliance Report of conditions stipulated in Environmental Clearance & Monitoring Report in Data Sheet reg.
48 22/10/2024 Proposed Smart Industrial Port City (SIPC) at green field Site 2 (KPT Complex, 850 Acres), Gandhidham, Kutch – Gujarat by M/s Kandla Port Trust – Six Monthly compliance Report of conditions stipulated in NOC/CTE Order reg.
49 08/11/2024 Submission of Annual Returns Hazardous waste (Form IV) (year 2023-24) and Environmental Statement in Form V (2023-24) for CCA AWH – 127510 for Deendayal Port Authority
Year- 2023    
1 10/02/2023 Point-wise compliance of conditions stipulated in the Environmental Clearance accorded by Ministry of Environment and Forests, Government of India vide letter dated 10.10.2017 for Smart Industrial Port City (SIPC) Green Field Site 1 (Adipur side of the Internet, South of Tagore Road, 580 acres), Gandhidham, Kutch-Gujarat for the proposed Smart Industrial Port City (SIPC) project by M/s Deendayal Port Authority.
2 10/02/2023 Point-wise compliance of conditions stipulated in the Consent (NOC) for Smart Industrial Port City (SIPC) project at Green Field Site 1 (North-East of Adipur Side-Antarjal, 580 acres), Gandhidham, Kutch, Gujarat-370 201 by M/s Deendayal Port Authority.
3 10/02/2023 Single Point Mooring (SPM) and associated facilities at Veera in Gulf of Kutch for handling crude oil on BOT basis in the State of Gujarat by M/s Kandla Port Trust (now Deendayal Port Authority) – Six monthly compliance reports of conditions stipulated in CRZ recommendations
4 10/02/2023 Establishment of Single Point Mooring (SPM) and associated facilities at Veera in Gulf of Kutch for management of crude oil on BOT basis – Environment in Data Sheet Reg and six monthly compliance reports of conditions stipulated in CRZ clearance and monitoring report.
5 11/02/2023 Compliance with the conditions stipulated in the Concurrence Establishment (NOC) issued by Gujarat Pollution Control Board, GoG for the proposal for “Construction of 13th to 16th Cargo Berth” at Deendayal Port Authority (Kandla Port Trust).
6 11/02/2023 Construction of 13th to 16th Cargo Berth at Deendayal Port Authority – Point-wise compliance of conditions in CRZ recommendations
7 11/02/2023 Compliance with conditions stipulated in the Environment & CRZ clearance granted by MoEF&CC, Government of India for “Construction of 13th to 16th Cargo Berth” at Deendayal Port Authority (Predecessor: Deendayal Port Trust).
8 11/02/2023 Environmental and CRZ clearance – Environment and CRZ clearance – Furnishing of information for construction of Interchange Road Over Bridge (ROB) at LC-236 [Kutch Namak Junction] on NH-141 upto Nehru Gate of Kandla Port, Gandhidham, Kutch proposed by M/s Deendayal Port Authority.
9 02/05/2023 Development of 7 integrated facilities (Stage I) within existing Kandla Port Trust limits in District Kutch (Gujarat) by M/s Kandla Port Trust Limited
10 02/05/2023 Development of 7 integrated facilities (Phase I) within existing Kandla Port Trust limits in District Kutch (Gujarat) by M/s Kandla Port Trust Limited – Point wise compliance of conditions stipulated in NOC (CTE- 74334) issued by GPCB
11 02/05/2023 Development of 7 Integrated Facilities (Stage I) within existing Kandla Port Trust limits in District Kutch (Gujarat) by M/s Kandla Port Trust Ltd. “Environment & CRZ Clearance – Point wise compliance of conditions stipulated in EC & CRZ Clearance and Monitoring Report Data Sheet.”
12 02/05/2023 Development of 7 integrated facilities (Phase I) within existing Kandla Port Trust limits in District Kutch (Gujarat) by M/s Kandla Pot Trust Ltd. – Point wise compliance of conditions stipulated in CRZ recommendations.
13 23/05/2023 Development of Integrated Facilities within the existing Deendayal Port Trust (erstwhile Kandla Port Trust) in District Kutch, Gujarat (Stage-II). (1. Establishment of Oil Jetty No. 7.) 2. Establishment of Barge Jetty at Jafarwadi 3. the establishment of the barge port in Vira; 4. Administrative office building in Tuna Tekra; 5. Road connecting Veera Barge Jetty to Tuna: Point wise compliance of conditions stipulated in GATE-CRZ recommendation by M/s Deendayal Port Authority (erstwhile Deendayal Port Trust).
14 23/05/2023 Development of Integrated Facilities within the existing Deendayal Port Trust (erstwhile Kandla Port Trust) in District Kutch, Gujarat (Stage II) (1. Establishment of Oil Jetty No. 7 2. Establishment of Barge Jetty at Jaffrabadi 3. Establishment of Barge Port at Vira 4. Administrative Office Building at Tuna Tekra 5. Road leading from Veera Barge Jetty to Tuna Gate by M/s Deendayal Port Authority (erstwhile Deendayal Port Trust) – EC & CRZ Clearance & Monitoring Report Point-wise compliance of conditions stipulated in the datasheet
15 23/05/2023 Development of Integrated Facilities within the existing Deendayal Port Trust (erstwhile Kandla Port Trust) in District Kutch, Gujarat (Stage II) (1. Establishment of Oil Jetty No. 7 2. Establishment of Barge Jetty at Jafrabadi 3. Establishment of Barge Port at Vira 4. Administrative Office Building at Tuna Tekra 5. Road leading from Veera Barge Jetty to Tuna Gate by M/s Deendayal Port Authority (erstwhile Deendayal Port Trust) – Prescribed in NOC/CTE issued by GPCB Point-wise compliance of conditions
16 23/05/2023 Construction of water front facilities (Oil Jetty 8, 9, 10 & 11) for associated facilities for storage by M/s Deendayal Port Authority (Ex: Deendayal Port) and development of land of area of 554 acres at Old Kandla, Gandhidham, Kutch, Gujarat by M/s Deendayal Port Authority (Ex: Deendayal Port) – Submission of point-wise compliance of conditions stipulated in NOC/CTE
17 23/05/2023 “CRZ Clearance for Construction of Water Front Facilities (Oil Jetty 8, 9, 10 & 11) and Development of Land of 554 Acres of Area” for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M/s Deendayal Port Trust – submission of six-monthly compliance to conditions stipulated in CRZ recommendations.
18 23/05/2023 Construction of water front facilities (0IL JT 8, 9, 10 & 11) for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M/s Deendayal Port Trust and development of land of 554 acres area – Submission of six monthly compliance reports for conditions stipulated in EC and CRZ Clearance and Monitoring Report in Environment and CRZ Clearance Data Sheet.
19 19/06/2023 Development of plots for construction of godowns/godowns (Phase II) at Kandla, Gujarat by Deendayal Port Authority (then: Deendayal Port Trust) – Compliance. Regarding the report of conditions stipulated in the Environment and CRZ Clearance and Monitoring Report in the Data Sheet (period up to November, 2022).
20 19/06/2023 Development of plots for construction of godowns/godowns (Phase II) at Kandla, Gujarat by Deendayal Port Authority (then: Deendayal Port Trust) – Regarding compliance report of NOC/CTE (period upto November, 2022).
21 19/06/2023 Regarding submission of annual return of hazardous waste in Form IV and V for the financial year 2022-23.
22 19/06/2023 Development of plots for construction of godowns/godowns (Phase II) at Kandla, Gujarat by Deendayal Port Authority (then: Deendayal Port Trust) regarding point-wise compliance of conditions in CRZ recommendation (period upto November 2022).
23 04/08/2023 Proposed Smart Industrial Port City (SIPC) Green Field Site 1 (Adipur-northeast side-Antarjal, south of Tagore Road, 580 acres), Gandhidham, Kutch-Gujarat by M/s Deendayal Port Authority – Submission of six-monthly compliance report for the project.
24 04/08/2023 Single Point Mooring (SPM) and associated facilities off Veera in Gulf of Kutch on BOT basis in the State of Gujarat by M/s. Kandla Port Trust (now Deendayal Port Authority) – Six monthly compliance reports of conditions stipulated in CRZ recommendations.
25 04/08/2023 Establishment of Single Point Mooring (SPM) and associated facilities off Veera in Gulf of Kutch for management of crude oil on BOT basis – six monthly compliance reports of conditions set out in the Environment and CRZ Clearance and Monitoring Report in respect of data sheets.
26 04/08/2023 Proposed Smart Industrial Port City (SIPC) Green Field Site 1 (Adipur-Northeast side) on Internetwork, South of Tagore Road, 580 acres), Gandhidham, Kutch, Gujarat-370 201″ Submission of six-monthly compliance report for the project by M/s. Deendayal Port Authority- Submission of six-monthly compliance report for the project.
27 07/08/2023 Bifurcation of Environment and CRZ clearance (600 mt out of total 4800 mt embankment) issued to M/s Essar Bulk Terminal Ltd. for expansion of port facility at Hazira, Surat, Gujarat – submission of compliance report of conditions stipulated in CRZ recommendation.
28 07/08/2023 Environmental and CRZ clearance of bifurcation (600 MT total 4800 MT off shore) issued to M/s Essar, – Extension of limited port facility for bulk terminal Hazira, Sura, Gujarat – Submission of prescribed compliance report Conditions registered in EC and CPZ clearance and monitoring datasheet.
29 07/08/2023 Consolidated Consent and Authorization (Renewal) Order No. AWH-110594 Date of Issue 22/01/2021 (GPCB ID 28494) – Submission of compliance report of stipulated conditions as mentioned in CCA order issued by GPCB.
30 14/08/2023 Construction of 13th to 16th Cargo Berth at Kandla by M/s Deendayal Port Authority (erstwhile Deendayal Port Trust) – Point wise compliance of conditions in CCRZ recommendations.
31 14/08/2023 Construction of 13th to 16th Cargo Berth at Kandla by M/s Deendayal Port Authority (erstwhile Deendayal Port Trust) – compliance report of conditions stipulated in Environment and CRZ Clearance and monitoring report in data sheet.
32 12/09/2023 Development of 3 remaining integrated facilities (Phase I) within the existing Deendayal Port Authority (then: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat – Point-wise compliance of conditions stipulated in EC & CRZ Clearance and Monitoring Report in respect of Datasheet.
33 12/09/2023 Development of 7 integrated facilities (Phase I) within existing Kandla Port Trust limits in District Kutch (Gujarat) by M/s Kandla Port Trust Limited – Point wise compliance of conditions stipulated in NOC (CTE- 74334) issued by GPCB.
34 12/09/2023 Development of 7 integrated facilities (Phase I) within existing Kandla Port Trust limits in District Kutch (Gujarat) by M/s Kandla Port Trust Limited – Point wise compliance of conditions stipulated in CRZ recommendations.
35 12/09/2023 Development of 3 remaining integrated facilities (Phase I) within the existing Deendayal Port Authority (then: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat, furnishing compliance report of stipulated conditions as mentioned in CTE issued by GPCB.
36 12/09/2023 Development of 3 remaining integrated facilities (Phase I) within the existing Deendayal Port Authority (then: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat Submission of point-wise compliance to conditions stipulated in CRZ recommendations.
37 12/09/2023 Development of 7 integrated facilities (Phase I) within existing Kandla Port Trust limits in District Kutch (Gujarat) by M/s Kandla Port Trust Limited – Environment & CRZ Clearance – Point wise compliance of conditions stipulated in EC & RZ Clearance and Monitoring Report in respect of datasheet.
38 18/09/2023 “CRZ clearance for development of land of 554 acres area for construction and storage of water front facilities (oil jetty 8, 9, 10 & 11) at Old Kandla, Gandhidham, Kutch, Gujarat by M/s Deendayal Port Authority” – submission of six-monthly compliance to conditions stipulated in CRZ recommendations.
39 18/09/2023 Development of land of 554 acres area for construction and storage of water front facilities (0IL JT 8, 9, 10 & 11) at Old Kandla, Gandhidharma, Kutch, Gujarat by M/s Deendayal Port Trust – Environment & CRZ Clearance – Submission of six monthly compliance reports for conditions stipulated in EEC & CRZ Clearance and Monitoring Report in the data sheet.
40 18/09/2023 4/5 Development of land of 554 acres for construction of water front facilities (Oil Jetty 8, 9, 10 & 11) and related facilities for storage at Old Kandla, Gandhidharan, Kutch, Gujarat by Deendayal Port Authority (then: Deendayal Port Trust) – Submission of point-wise compliance with the stipulated conditions in respect of NOC/CTE.
41 08/11/2023 Six monthly compliance reports of conditions stipulated in the NOC/CTE order at Green Field Site 2 (KPT Complex, 850 acres), Gandhidham, Kutch, Gujarat by M/s Kandla Port Trust.
Year – 2022    
1 03/02/2022 Single Point Mooring (SPM) and associated facilities at Veera in Gulf of Kutch for handling crude oil on BOT basis in the State of Gujarat by M/s Kandla Port Trust (now Deendayal Port Authority) – compliance with conditions stipulated in CRZ recommendations. Report No.: EG/WK/5202(D)/Part (CRZ-2) 134-1
2 03/02/2022 Establishment of Single Point Mooring (SPM) and associated facilities at Veera in Gulf of Kutch for management of crude oil on BOT basis – Environment in Data Sheet Reg and six monthly compliance reports of conditions stipulated in CRZ clearance and monitoring report.
3 09/02/2022 Development of land measuring 554 acres for construction and storage of water front facilities (Oil Jetty 8, 9, 10 & 11) at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority-Submission of six monthly compliance reports of prescribed conditions mentioned.
4 09/02/2022 Development of land of 554 acres area for construction and storage of water front facilities (oil jetties 8, 9, 10 & 11) at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority-Submission of six monthly compliance reports of conditions stipulated in CRZ recommendation.
5 09/02/2022 Development of land of 554 acres area for construction and storage of water front facilities (Oil Jetty 8, 9, 10 & 11) at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority – Submission of six monthly compliance reports of conditions stipulated in EC & CRZ clearance reg.
6 12/02/2022 Development of Integrated Facilities within the existing Deendayal Port Authority (erstwhile Kandla Port Trust) in Kutch, Gujarat District (Phase II). Installation of oil jetty No. 7. Establishment of Barge Jetty at Jaffrabadi. Establishment of the barge port in Viera 4. Administrative Office Building in Tuna Tekra 5. Road connecting Veera Barge Jetty to Tuna Gate by M/s Deendayal Port Authority (erstwhile Kandla Port Trust) – Monitoring Repo in six monthly compliance reports and data sheets of conditions stipulated in Environment and CRZ clearance
7 12/02/2022 Point-wise Compliance Status Report for CRZ Clearance (Phase-II) for development of integrated facilities within existing Kandla Port in Kandla District of Kutch by M/s Kandla Port Trust
8 12/02/2022 Development of Integrated Facilities within the existing Deendayal Port Authority (erstwhile Kandla Port Trust) in Kutch District of Gujarat (Phase-II). (1. Establishment of oil jetty No. 7.) 2. Establishment of Barge Jetty at Jaffarwadi. the establishment of the barge port in Vira; 4. Administrative office building in Tuna Tekra; 5. Road connecting Veera Barge Jetty to Tuna Gate by M/s Deendayal Port Authority (erstwhile Kandla Port Trust)
9 12/02/2022 CRZ clearance proposed for development of Integrated Facility (Phase-I) – Remaining three facilities within existing Kandla Port at Kandla, District by M/s Deendayal Port Authority (Former: Kandla Port Trust) Kutch – Compliance with conditions stipulated in CRZ recommendations
10 12/02/2022 Development of 3 remaining integrated facilities (Phase I) within existing Deendayal Port Authority (Ex: Kandla Port Trust) at Gandhidham, Kutch, Gujarat – Environment & CRZ clearance – Submission of compliance report of stipulated conditions.
11 15/02/2022 Environmental and CRZ clearance – Environment and CRZ clearance – Furnishing of information for construction of Interchange Road Over Bridge (ROB) at LC-236 [Kutch Namak Junction] on NH-141 upto Nehru Gate of Kandla Port, Gandhidham, Kutch proposed by M/s Deendayal Port Authority.
12 15/02/2022 Environment and CRZ clearance for construction of Interchange Road Over Bridge (ROB) on LC-236 [Kutch Namak Junction] on NH-141 up to Nehru Gate of Kandla Port, Gandhidham, Kutch proposed by Deendayal Port Authority – NOC/CRZ Clearance – NOC/NOC Compliance with conditions outlined in CTE Reg
13 15/02/2022 Environmental and CRZ clearance for construction of Interchange Road Over Bridge (ROB) at LC-236 [Kutch Namak Junction] on NH-141 upto Nehru Gate of Kandla Port, Gandhidham, Kutch proposed by M/s Deendayal Port Authority – Environment and CRZ Clearance – Furnishing of Information
14 23/02/2022 Green Field Site 1 (Towards Adipur-North-East of Interweb, South of Tagore Road, 580 acres), Gandhidham, Kutch-Gujarat Proposed by M/s Kandla Port Trust – Compliance Report of conditions stipulated in Environmental Clearance
15 23/02/2022 Compliance Report (NOC) for establishment of Smart Industrial Port City (SIPC) at Green Field Site 1 (Adipur side of the Internet-North-East, South of Tagore Road, 580 acres), Gandhidham, Kutch, Gujarat-370 201 by M/s Deendayal Port Authority.
16 05/04/2022 Bifurcation of Environmental and CRZ clearances (600 MT out of total 4800 MT) issued to M/s Essar Bulk Terminal Ltd. for expansion of port facility at Hazira, Surat, Gujarat- Transfer of Environment & CRZ clearances- Transfer of Environment & CRZ clearances- Reg.
17 06/07/2022 Establishment of Single Point Mooring (SPM) and associated facilities out of Veera in Gulf of Kutch for management of crude oil on BOT basis – six monthly compliance reports of conditions stipulated in environment and CRZ clearances and monitoring report in data sheets
18 06/07/2022 Single Point Mooring (SPM) and associated facilities at Veera in Gulf of Kutch for handling crude oil on BOT basis in the State of Gujarat by M/s Kandla Port Trust (now Deendayal Port Trust) – compliance with conditions stipulated in CRZ recommendations.
19 07/07/2022 Submission of Annual Return in Form IV format for the financial year 2021-22 to hazardous waste.
20 07/07/2022 Submission of environmental statement in Form V format for the financial year 2021-22.
21 11/07/2022 Environment & CRZ Clearance for Construction of Interchange Road Over Bridge (ROB) at LC-236 [Kutch Namak Junction] on NH-141 upto Nehru Gate of Kandla Port, Gandhidham, Kutch proposed by M/s Deendayal Port Authority – NOC/CRZ Clearance – NOC/Kutch Junction Compliance with conditions outlined in CTE Reg
22 11/07/2022 Environmental and CRZ clearance for construction of Interchange Road Over Bridge (ROB) at LC-236 [Kutch Salt Junction] on NH-141 upto Nehru Gate of Kandla Port, Gandhidham, Kutch proposed by M/s Deendayal Port Trust – Environment and CRZ clearance – Furnishing of Information
23 11/07/2022 Six monthly compliance report of CRZ recommendation for construction of Interchange Road Over Bridge (ROB) at LC-236 [Kutch Namak Junction] on NH-141 upto Nehru Gate of Kandla Port, Gandhidham, Kutch proposed by M/s Deendayal Port Authority.
24 11/07/2022 Development of land of 554 acres area for construction and associated facilities for storage of water front facilities (Oil Jetty 8, 9, 10 & 11) at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority – Submission of six monthly compliance reports of conditions stipulated in CRZ recommendation
25 11/07/2022 Development of land of 554 acres area for construction and associated facilities for storage of water front facilities (Oil Jetty 8, 9, 10 & 11) at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority – Submission of six monthly compliance reports of conditions stipulated in EC & CRZ clearances
26 11/07/2022 Development of land of 554 acres for construction and associated facilities for storage of water front facilities (Oil Jetties 8, 9, 10 & 11) at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority – NOC/NOC Submission of six monthly compliance reports of the prescribed conditions as stated by CTE Reg
27 11/07/2022 Compliance Report (NOC) for establishment of Smart Industrial Port City (SIPC) at Green Field Site 1 (Adipur side of the Internet-North-East, South of Tagore Road, 580 acres), Gandhidham, Kutch, Gujarat-370 201 by M/s Deendayal Port Authority.
28 11/07/2022 Compliance report of conditions stipulated in Environment Clearance (EC) reg proposed at Green Field Site 1 (North-East of Adipur-Antarjaal, 580 acres), Gandhidham, Kutch-Gujarat by M/s Kandla Port Trust.
29 13/07/2022 Proposed CRZ clearance for development of Integrated Facility (Phase-I) – remaining three facilities within the existing Kandla Port in Kutch by M/s Deendayal Port Authority (Predecessor: Deendayal Port Trust) – compliance with conditions stipulated in CRZ recommendations.
30 13/07/2022 Development of 3 remaining integrated facilities (Phase I) within the existing Deendayal Port Authority (Former: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat – Environment & CRZ clearance – Submission of compliance report of stipulated conditions.
31 13/07/2022 Development of 3 remaining integrated facilities (Phase 1) within the existing Deendayal Port Authority (Ex: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat – Submission of compliance report of stipulated conditions mentioned in CTE issued by GPCB
32 14/07/2022 Development of Integrated Facilities within the existing Deendayal Port Trust (erstwhile Kandla Port Trust) in Kutch District, Gujarat (Phase II). Installation of oil jetty No. 7. Establishment of Barge Jetty at Jaffrabadi. Establishment of the barge port in Viera 4. Administrative Office Building in Tuna Tekra 5. Road connecting Veera Barge Jetty to Tuna Gate by M/s Deendayal Port Trust (erstwhile Kandla Port Trust) – Six monthly compliance reports of conditions stipulated in environment and CRZ clearance and monitoring report in data sheet reg
33 14/07/2022 Development of integrated facilities within the existing Deendayal Port Authority (erstwhile Deendayal Port Trust) in Kutch, Gujarat District (Phase II). Installation of oil jetty No. 7. Establishment of Barge Jetty at Jaffrabadi. Establishment of the barge port in Viera 4. Administrative Office Building in Tuna Tekra 5. Submission of compliance report of the stipulated conditions mentioned in the CTE issued by M/s Deendayal Port Authority (erstwhile Kandla Port Trust) connecting road from Veera Barge Jetty to Tuna Gate
34 14/07/2022 Development of Integrated Facilities within the existing Deendayal Port Trust (erstwhile Kandla Port Trust) in Kutch District of Gujarat (Phase-II). (1. Establishment of oil jetty No. 7.) 2. Establishment of Barge Jetty at Jaffarwadi. the establishment of the barge port in Vira; 4. Administrative office building in Tuna Tekra; 5. Compliance with the conditions stipulated in the CRZ recommendations on the road connecting Veera Barge Jetty to Tuna Gate by M/s Deendayal Port Authority (erstwhile Deendayal Port Trust)
35 14/07/2022 Consolidated Consent and Authorization (Renewal) Order No. AWH-110594 Date of Issue 22/01/2O21 (GPCB ID 28494) – Submission of compliance report of stipulated conditions as mentioned in CCA order issued by GPCB
36 22/07/2022 Construction of 13th to 16th Cargo Berth at Kandla Port by M/s Deendayal Port Authority (Predecessor: Deendayal Port Trust) – Submission of compliance report of stipulated conditions mentioned in CTE issued by GPCB.
37 22/07/2022 Construction of 13th to 16th cargo berth at Kandla Port by M/s Deendayal Port Authority (Predecessor: Deendayal Port Trust) – Compliance with conditions stipulated in CRZ recommendations.
38 22/07/2022 Construction of 13th to 16th Cargo Berth at Kandla Port by M/s Deendayal Port Authority (Predecessor: Deendayal Port Trust) – Six monthly compliance reports of conditions stipulated in the Environment and CRZ Clearance and Monitoring Report in the Data Sheet.
39 17/08/2022 Development of plots for construction of liquid storage tank farm at Kandla, Gujarat by M/s Deendayal Port Authority (Predecessor: Deendayal Port Trust) – Environment in Data Sheet Reg and point-wise compliance report of conditions stipulated in CRZ clearance and monitoring report.
40 17/08/2022 Development of plots for construction of Liquid Storage Tank Farm at Kandla, Gujarat by M/s Deendayal Port Authority (Predecessor: Deendayal Port Trust) – Point wise compliance report of conditions stipulated in CRZ recommendation.
41 17/08/2022 Development of plots for construction of Liquid Storage Tank Farm at Kandla, Gujarat by M/s Deendayal Port Authority (Predecessor: Deendayal Port Trust) – Point wise compliance report of conditions stipulated in NOC issued by GPCB.
42 23/08/2022 Point-wise compliance report of conditions stipulated in Environmental Clearance and Monitoring Report in Green Field Site 2 (KPT Complex, 850 acres), Gandhidham, Kutch-Gujarat proposed by M/s Deendayal Port Authority (erstwhile Deendayal Port Trust) at Green Field Site 2 (KPT Complex, 850 acres), Gandhidham, Kutch-Gujarat.
43 23/08/2022 Point-wise compliance report of conditions stipulated in NOC issued by GPCB at Green Field Site 2 (KPT Complex, 850 acres), Gandhidham, Kutch-Gujarat by M/s Deendayal Port Authority (erstwhile Deendayal Port Trust).
Year – 2020    
1 18/02/2020 Development of 3 remaining integrated facilities (Phase I) within existing Kandla Port Trust at Gandhidham, Kutch, Gujarat by M/s Kandla Port Trust – Environment and CRZ clearance – Reg.
2 19/02/2020 Development of Integrated Facilities within the existing Deendayal Port Trust (erstwhile Kandla Port Trust) in Kutch District of Gujarat (Phase-II). (1. Establishment of oil jetty No. 7.) 2. Establishment of Barge Jetty at Jaffarwadi. the establishment of the barge port in Vira; 4. Administrative office building in Tuna Tekra; 5. Road connecting Veera Barge Jetty to Tuna Gate by M/s Deendayal Port Trust (erstwhile Kandla Port Trust) – Environment & CRZ Clearance
3 24/11/2020 Expansion of the port by M/s Deendayal Port Trust (earlier known as Kandla Port Trust) by developing land of 554 acres for construction of water front facilities (Oil Jetty 8,9,10 & 11) and associated facilities for storage at Old Kandla, Gandhidham, Kutch (Gujarat) – Environment & CRZ Clearances.
Year – 2016    
1 20/12/2016 Development of 7 integrated facilities (Phase-I) within existing Kandla Port

 