Close

Work Order Issued

  1. Home
  2. /
  3. Work Order Issued
Updated On: 27-12-2023 03:10 PM

 

 

Date of Upload Subject
04/12/2024 Details of work assigned to CSIR-CSMCRI-Obtaining Environmental & CRZ Clearance for the proposal “Development of Container and Multipurpose Cargo Berths at Deendayal Port Authority, Kandla”
14/10/2024 Two years of contract for house keeping & Cleaning of gate office buildings and non residential buildings inside cargo jetty area.
14/10/2024 Two years contract for maintenance of R.O. Plants inside and outside cargo jetty area at new kandla
11/10/2024 “Modification and Strengthening of South Wharf along with Backup Area at Bunder Basin”
10/10/2024 Work Order for the “Dredging in the Navigational Channel, Kandla Creek & Alongside Cargo Brths/Oil Jetties at Deendayal Port Authority for the Year 2024-2027
10/10/2024 Services of third party government survey agency for the dredging at Deendayal Port(2024-27)
07/10/2024 Development of 7 Integrated Facilities (Stage I) within the existing Deendayal Port Authority limit at District Kutch (Gujarat) by M/s Deendayal Port Authority (Erstwhile: Kandla Port Trust)
25/07/2024 Work order – AMC white washing distempering, painting to resi and non resi bldg at gopalpuri gandhidham and adipur for a year
24/06/2024 Work Order-PMC services for shore protection works at Hazira RoRo/RoPax Terminal
11/06/2024 Nomination work awarded to GUIDE, Bhuj to comply with the conditions stipulated by the MoEF&CC,GoI in the EC & CRZ Clearances accorded to DPA for various projects & also to fulfill statutory requirement
11/06/2024 Works Assigned to the Gujarat Institute of Desert Ecology, Bhuj to comply with the condition stipulated by the MoEF&CC,GoI in the EC & CRZ Clearance accorded to DPA
11/06/2024 Nomination works awarded to GUIDE CRZ Demarcation reg
27/12/2023 Work order – construction of E & D type quarters at Gopalpuri
22/12/2023 Details of Work assigned to the Gujarat Institute of Desert Ecology, Bhuj vide Work order dt. 20.12.2023
25/10/2023 Detail of work assigned to GEMI for EMP vide work order 25.10.2023
17/09/2023 Providing Project Management Consultancy Services (PMC) during the pre-award stage for “Capital dredging work for Proposed Container Terminal at Tuna Tekra of Deendayal Port Authority- Financial Proposal of Indian Institute of Technology Madras, Chennai – Reg
19/07/2023 Details of Work Assigned to the Gujarat Institute of Desert Ecology, Bhuj.
07/07/2023 Raising & upgrading the RCC Plots adjoining to track no.10, 11 & 12 inside cargo jetty area.
23/06/2023 Greenbelt Development in Deendayal Port Authority and its surrounding areas.
29/05/2023 Providing Project Management consultancy services (PMC) during the pre-award stage for the work “Dredging in the Navigational Channel, Kandla Creek & Alongside Cargo Berths/Oil Jetties at Deendayal Port Authority for year 2024-27” on nomination basis.
29/05/2023 Techno-commercial feasibility (TEF) study & finalization of work – ‘Development of Green Hydrogen Hub at Deendayal Port, Kandla’ & allied common user facilities.
23/05/2023 Work Order to GEMI CO2 Emissions and Reduction
22/05/2023 Study of CO2 Emission Estimation and Reduction Strategy under Maritime India Vision 2030
02/05/2023 Online Dredging Monitoring System for Deendayal Port Authority- near Real-Time Dredging Monitoring System software” – Financial Proposal of NTCWPC-IITM – Reg
20/04/2023 Details of Work Assigned to the Gujarat Environment Management Institute (GEMI), Gandhinagar for “Preparing and Monitoring of Environmental Monitoring and Management Plan for Deendayal Port Authority At Dahej- Hazira –Ghogha for a period of 3 Years”-reg.
20/03/2023 Maintenance contract for Tree Plantation near offices, other buildings, along roads, islands, gates, etc. inside / outside cargo jetty area for two years.
17/03/2023

Details of Work Assigned to M/s Gujarat Environment Management Institute (GEMI), Gandhinagar for “Preparing and Monitoring of Environmental Monitoring and Management Plan for Deendayal Port Authority at Kandla and Vadinar for a period of 3 years”-reg.

17/03/2023

Details of Work Assigned to M/s Gujarat Environment Management Institute (GEMI), Gandhinagar for “Carrying out fresh baseline study for a period of one season (March-to-May) in connection with the DPA proposal “Augmentation of liquid Cargo Handling Capacity from 8 MMTPA to 23.8 MMTPA through modernization of existing pipeline network at Oil Jetty Area, Deendayal Port, Kandla – Environment and CRZ Clearance”.

17/03/2023

Details of Work Assigned to M/s The Energy & Resources Institute (TERI), New Delhi for “Transition of Business Operations to Water Neutrality – Water Neutrality of Deendayal Port, Kandla (Phase I – Study & Assessment)”

25/01/2023 Details of Work Assigned to M/s Gujarat Environment Management Institute (GEMI), Gandhinagar for “Preparation of Plan for Management of Plastic Wastes, Solid Wastes including C&D wastes, E-Wastes, Hazardous Wastes including Biomedical and Non-Hazardous Waste in the Deendayal Port Authority Area
17/01/2023 Details of work Assigned to M/s IIT-M, Chennai for “Coastal Protection using Sea wall for Muldwarka Port (within harbour)”
16/01/2023 Details of work Assigned to M/s IIT-M, Chennai for “Review of Master Plan 2047 for Deendayal Port”
28/12/2022 Providing Project Management Consultancy Services (PMC) during the pre-award stage for the work “Capital dredging at Oil Jetty No.08 -Berth Pockets, Maneuvering area and Kandla Creek Inner (Buoy no.15 A to Oil Jetty No.08)
28/12/2022 Appointment of Independent Environmental monitoring while carrying out Captial dredging to check impact and take necessary measures at Oil Jetty no. 07 – Work Order
02/12/2022 Appointment of consultant is for architectural work, design, drawing, estimate for “Construction of Administrative Office Building in place of P&C Building Outside Cargo Jetty Area” at Kandla, Deendayal Port Authority
14/11/2022 Click here to Download Work order for providing consultancy services for carrying out fesability study for expansion of existing railway siding for tekra port of deendayalport authority to serve upcoming cargo berths.
21/04/2022 Maintainance contract for non-residental buildings inside harbour area civil work.
23/03/2022 Work order for Comprehensive study for the Deepening of Navigational channel to increase the draught of Navigational Channel at Deendayal Port Trust including Capital & Main
15/03/2022 S/R to Road along side godown no 18,24,32,33 insiide cargo jetty area.
16/10/2021 Work Order to NCSCM Chennai 12 10 2021
28/09/2021 Click here to Download Uploading of the work orders issued w.e.f. 01.01.2021 to 30.06.2021
28/09/2021

Click here to Download LOA and Work Order of Tender No.01-2019 for the work of Fabrication of 01 no. Water Tender Type-B Diesel Cowl Chassis Wheel Base 4225-4300-4330mm.

 

 

 

 

Color